Next Power has built a 30 KWP photovoltaic system capable of producing 39,000 kilowatt hours annually at the BCS Group’s Via Settevalli headquarters.
In addition, a major Daikin air-conditioning system that can be used in both winter and summer, combined with high technology, was built.
The pcs company pays attention to sustainability, which is why it also decided to install an electric vehicle charging station
Before the intervention
120,000 kilowatt-hours per year of energy taken from the national grid plus 15,000 cu m methane gas
After the intervention
- 30-kwp photovoltaic system capable of producing 39,000 kilowatt hours annually plus 0 mc methane gas plus Lakes air conditioning system in high-tech
- 25,000 kg CO2 saved.